250kW×12 LPG gas generator sets|Qatar
Project location: Qatar Generator set: 250kW×12 LPG gas generator sets (external container). Project introduction: The customer’s factory is located in the suburbs and has no power and electricity. The project is mainly for self-sufficiency Solution introduction: This project adopts ComAP i...Read More -
SMOOTH DELIVERY OF 12.5 MW BIOMASS GAS GENERATOR-NPT
On September 15, 2020, the NPT YC6CN series of biomass gas generator sets successfully passed performance tests such as sudden addition, sudden reduction, full load, and high temperature, and was shipped from Qingdao Port to Central Asia. The total installed capacity of this batch o...Read More -
Start-up analysis of gas generator set failure
For the operation of a power plant, electrical equipment and generators are important links, which can affect the power supply capacity of the power plant to a large extent. If the power supply capacity is insufficient, then industrial production will...Read More -
How to use the generator set correctly under harsh
The use of generator sets under harsh environmental conditions is mainly due to the impact of environmental factors. Some measures and methods must be adopted in high-altitude plateau areas and under cold weather conditions. The following are the spec...Read More